Liaocheng Jinshan Steel Pipe Co., Ltd.

Location: Liaocheng, Shandong/China

  • Device model: BRD-300
  • Type of sludge treated: Pickling sludge
  • Processing capacity: 440kg/h
  • Project date: November 2018
  • Inlet water content: 75%
  • Mud water content: 20%
  • Reduction rate: 68%
The daily mud production on the project site is 10 tons, the processing cost of the tons is ¥1,500, and the daily processing cost is ¥15,000. After using the dryer of our company, the daily weight reduction is 6.8 tons, the processing cost per ton is 240 yuan (local natural gas cost is ¥3.5/m³), and the daily cost is ¥7,800.

Treatment effect comparison :

Before treatment

after treatment

Liaocheng Jinshan Steel Pipe Co., Ltd.